Operation Manual

ASSEMBLING AND ADJUSTMENTS
English 23
Catcher
Assembly
Fit the catcher bag.
Insert the catcher bag’s edging strip into the groove
around the upper cover and press on the strip to the
end.
Fasten the three snap fasteners around the bar of the
upper cover.
Attach the hooks in the upper edge of the chassis.
Fit the bagger bottom in the discharge hole.
Cutting height
The cutting height can be adjusted in 10 different steps.
Move the lever to the back for higher cutting height
and to the front for lower cutting height.
Filling with oil
The oil tank is empty at delivery. Fill the oil slowly. See
also instructions under the Maintenance heading. The
engine oil should be changed the first time after 5
hours running time.
CAUTION! Do not set the cutting height too low as there
is a risk that the cutters might hit ground with
unevenness.