Installation Guide

Product Installation Guide
Flow Through Valve Kit with
Inlet Group for Powerow
v22.11.1
Assemble the vessel, t - piece and ow
through valve as shown in gure 1.
Screw the ow through valve as far into the
t - piece as it will go and then turn back if
necessary to achieve the orientation shown.
PTFE tape or similar will be required to seal
on the threads of both the vessel and the
ow through valve.
Orientation is important, the ow through
valve water diverter paddle should be at a
90° angle to the tube as shown in gure 2.
For full installation including inlet group see
gure 3.
gure 2gure 1
gure 3

Summary of content (1 pages)