EXTENSION PANEL INSTALLATION (If Applicable)
Step 1. Slide front panel A onto front of tub.
Step 2. Slide top panel B over Tile Flange
Step 3. Refer to Detail A on fastening ange
to studs and sealing
If applicable,
The drain body
and hose muse be
installed horizontal
WALK-IN INSTALLATION PROCEDURES:
1. Bathtub must be set on a solid at surface, either concrete slab or a minimum 3/4" plywood sub-oor.
2. All adjustable feet must rmly contact with the oor.
3. The bath must be completely level from side to side and front to back on the top lip of the bath.
4. Plumbing hardware (faucet, hoses, and waste/overow) should be installed prior to setting tub in-place.
5. Filler panel is used for 60" opening installations. (if applicable)
6. The drain body is to be installed between the drain shoe and the drain tee. (if applicable)