FREESTANDING INSTALLATION INSTRUCTIONS
for Oasis
For installations on slabs or other installations where access from below the tub is impossible, we
require cutting a hole in the slab or sub-oor large enough that it extends outside the base of the
tub. This will allow easier connection of the waste/overow and then can be re-lled and nished
upon completion of installation and testing. (See General Guidelines, page 7)
NOTE: Air and drain
connections will vary.
Air (if applicable)
Drain
1. Clean, level, and prepare the oor for installation.
2. Place the unit in the exact installed position on the
oor and trace the outline of the bath with a pencil
or any erasable marking (gure 1).
3. Determine the location of the drain pipe, and
air line (on units with remote blower location on
Air Massage Systems) on the oor by taking
measurements of the drain and waste location
underneath the unit (gure 2).
Note: Drain and waste locations will vary by model.
4. Using a blanket, or other clean protective surface,
turn the unit on its side so that the unit is properly
supported during drain installation.
5. Clean the drain hole area in preparation of setting
the drain. The area should be dry and free of any
debris.
INSTALL DRAIN
Drain Hardware
6. Apply a bead of clear RTV silicone or plumbers
putty around the Drain Body and pass it through
the drain hole (gure 3).
7. Apply plumbers putty to the Washer and slide it
over the bottom of the Drain Body (gure 3).
8. Slide the paper washer over the drain body.
9. Attach the Drain Body Nut on the Drain Body and
tighten until the Nut and Washer have created
a seal with the bottom of the bathtub. DO NOT
OVER TIGHTEN (gure 4).
PREPARE TAIL PIECE
1
1
/2" pt x
1
1
/2" slip
PVC Adapter
Pop-up
Cover
Drain body
Rubber drain
gasket
1
1
/2" pt x
1
1
/2" slip
PVC Adapter