UNIT INSPECTION CHECKLIST
Complete the inspection procedures below before
preparing unit for installation:
1) Visually inspect unit for any shipping damage. Damage
must be reported immediately to the shipping
company to make a claim.
2) Ensure that the carrier makes proper notation of any
shortages or damage on all copies of the freight bill
and completes a common carrier inspection report.
3) Verify that unit nameplates on the data label match
the sales order or bill of lading (including, unit
configuration, size and voltage).
4) Immediately before installation, remove unit front
panel and verify that all electrical connections are
tight and that there are no loose wires.
5) Check to make sure that the refrigerant piping is free
from any kinks and there is no interference between
unit piping and sheet metal or electrical wires.
6) Check that the blower spins freely within the housing
and that there are no obstructions between the wheel
and housing. The wheel can sometimes come loose in
shipping.
7) Ensure that the evaporator distributor tubes are not
touching one in another and that they are over the
drain pan.
8) Check the air-coil fins for any damage during shipping.
9) Ensure that the shipping screws are removed from
the unit. Refer to
FIGURE 3 – Standard Packaging with
Brackets for more information.
Check the unit nameplate for correct voltage with the
plans before installing the equipment. Also, make sure all
electrical ground connections are made in accordance
with local code.
FIGURE 3– Standard Packaging with Brackets