User Manual
7
Installation Overview
The information below is an overview for installing the unit and auxiliary equipment.
Unpack and inspect the equipment.
Perform a pre-installation function check test of the equipment, and configure
parameters.
Pay particular attention to environmental conditions at the site, ventilation
requirements, and grounding and lightning protection.
Install the equipment at the site.
Make necessary electrical and cabling connections, including the following:
- DC power cord
- Coaxial cables to TX and RX antennas (if you use two antennas)
Perform a post-installation function check test of the equipment, to verify proper
installation.
Before Installation
Before you install the unit at the site, you are suggested to power on the unit and
check it for proper operation.
1. Applying Power
Before applying power to the unit, make sure the voltage of DC power supply or
battery is compliant with the operating voltage range of the unit. Then connect the DC
power supply or battery to supply power to the unit.
2. Verifying Proper Operation
Operation of the unit can be indicated by the 8 LEDs located on the front panel. After
proper operation is verified, you can configure parameters for the unit.
Caution: Some unit components can become extremely hot during operation.
Turn off all power and wait until the unit is sufficiently cool before touching the
unit.
3. Configuring Parameters