Datasheet
Test and verify the operation of the System Storage network attached storage system.
Provide up to two (2) of your designated personnel with two (2) hours of basic skills instruction.
Number of hours of Service, 32 hours
IM005 - IBM Implementation Services - ServicePac for storage software TotalStorage Productivity Center (basic)
Basic implementation -
Implement up to two (2) data agents on supported operating system platform, one (1) fabric agent on supported operating systems
and/or devices and one (1) CIMOM agent server for a supported IBM storage device.
Test and verify the operation of the System Storage software.
Provide up to two (2) of your designated personnel with two (2) hours of basic skills instruction.
Number of hours of Service, 32 hours
IM006 - IBM Implementation Services - ServicePac for storage software TotalStorage Productivity Center (plus)
Plus implementation -
Implement up to five (5) data agents on supported operating system platforms, up to two (2) fabric agents on supported systems
and/or devices and up to three (3) CIMOM agent servers for a supported IBM storage device.
Test and verify the operation of the System Storage software.
Provide up to two (2) of your designated personnel with two (2) hours of basic skills instruction.
Number of hours of Service, 56 hours
IM007 - IBM Implementation Services - ServicePac for System i (LPAR implementation)
Implement up to four (4) LPARs using the Hardware Management Console (HMC) and partition the hardware
(memory, CPU, I/O, peripherals), using the HMC.
Install the System i operating system, i5/OS, on each LPAR.
Test and verify the operation of the LPARs on the System i.
Provide up to two (2) of your designated personnel with two (2) hours of basic skills instruction.
Number of hours of Service, 32 hours
IM008 - IBM Implementation Services - ServicePac for System p (LPAR implementation)
Implement up to four (4) LPARs using the Hardware Management Console (HMC) and partition the hardware
(memory, CPU, I/O, peripherals), using the HMC.
Install the System p operating system, AIX, on each LPAR.
Test and verify the operation of the LPARs on the System p.
Provide up to two (2) of your designated personnel with two (2) hours of basic skills instruction.
Number of hours of Service, 32 hours
IM009 - IBM Implementation Services - ServicePac for System x (BladeCenter)
Rack and stack BladeCenter chassis.
Update BIOS and Firmware as required.
Install up to seven (7) blades in BladeCenter chassis.
Install a supported Microsoft operating system or a supported Linux operating system and configure basic networking.
Test and verify the operation of the BladeCenter.
Provide up to two (2) of your designated personnel with two (2) hours of basic skills instruction.
Number of hours of Service, 24 hours
IM010 - IBM Implementation Services - ServicePac for System x (pre-assembled BladeCenter)
Update BIOS and Firmware as required.
Install up to three (3) blades in BladeCenter chassis.
Install a supported Microsoft operating system or a supported Linux operating system and configure basic networking.
Test and verify the operation of the BladeCenter.
Provide up to two (2) of your designated personnel with two (2) hours of basic skills instruction.
Number of hours of Service, 16 hours
IM011 - IBM Implementation Services - ServicePac for IBM Director
Implement IBM Director with one (1) management server and up to two (2) managed systems.