Operation Manual

6. Insert the new battery:
a. Position the battery so that the positive (+) symbol is facing away from you.
b. Use one finger to press the top of the battery clip away from the battery.
c. Press the battery into the socket until it clicks into place. Make sure that the
battery clip holds the battery securely.
7. Reinstall the server cover as described in “Installing the cover and bezel” on
page 58.
8. Reconnect the external cables; then, reconnect the power cords and turn on the
peripheral devices and the server.
Note: You must wait approximately 20 seconds after you connect the power
cord of the server to an electrical outlet before the power-control button
becomes active.
9. Start the Configuration/Setup Utility program and set configuration parameters.
v Set the system date and time.
v Set the power-on password.
v Reconfigure the server.
See the section about using the Configuration/Setup Utility program in the
Users Guide on the IBM xSeries Documentation CD for details.
Figure 2. Installing the battery
54 IBM xSeries 365 Types 8861, 8862: Hardware Maintenance Manual and Troubleshooting Guide