User's Manual

6. UNIT INSTALLATION
Before installing the PSS‐1 unit, please check that the delivery is complete and that the
unit and any accessory parts are intact and free from any signs of transportation damage.
Also ensure that all external and internal packaging has been removed from the unit
before installation.
Please retain all packaging for future transportation and
storage of the unit and its accessories.
The PSS‐1 unit should be installed in a location which meets the following
requirements:
Safe and suitable operating environment (see Section 5)
Solid, stable, level working surface
At least 10cm clearance around the unit to adjacent objects and walls
Earthed AC mains power connection (see Section 4)
Please also observe and abide by the Unit Installation and Operating
Environment safety precautions and preconditions listed in Section 5.
The power for this unit must come from a stable mains supply that
matches the specification on the back panel of the unit. Do not power
from inverters, frequency convertors, or generators (see Section 5).
Ensure that the correct fuse type has been fitted in the mains inlet fuse
holder as detailed on the back of the unit. See Section 4 for details.
If the unit has been stored in a cool environment, it must be left to
stand unplugged until it has acclimatised to the new room temperature
before being powered.
Install and test the PSS‐1 unit using the following procedure:
1)Place the unit on the suitably selected working surface (as specified above),
ensuring that the ventilation holes underneath and on the rear of the unit are not
obstructed.
2)Connect the unit to the AC mains power outlet using the mains power cord
supplied or as specified in Section 4.