Instruction Manual

Wall Mount Cabinet, 12 & 26 RMS
I N S T A L L A T I O N I N S T R U C T I O N S
888-ASK-4ICC csr@icc.com icc.com
©Copyright 2014, ICC. ICC and ICC logo are registered trade name and trademark. All rights reserved MSR-0534-RevA
Detail B
DOOR HINGES
ADJUSTABLE DEPTH
FRONT DOOR HINGE
CAUTION!
Do not overload the cabinet. Cabinet can support up to 150 lbs. of equipment when properly installed using all mounting holes.
Make sure wall has a structural load capacity that will support the weight of the cabinet fully loaded equipment.
Do not attempt to lift the cabinet alone.
Before installation, locate where the cabinet is to be installed; concrete walls, plywood and wooden studs are recommended.
Step 1: Use a level to mark locations for mounting screws as
shown above. Templates and screws are not provided.
ICCMSWMC12: requires four (4) ¼-10 X 2 Lag Screws
ICCMSWMC26: requires eight (8) ¼-10 X 2 Lag screws
Step 2: Drill screws into marked locations without fully tightening
them. Leave at least a .2” gap between screws and wall.
Note: Make sure the screws you are using fit the screws slot shown
in Detail A.
Step 3: Place the Wall Mount Cabinet onto the pre-drilled screws,
then tighten all screws. Screws and screw slots should look like
Detail B when fully tighten.
NOTE: To adjust the depth of the rail, lightly untighten the screw,
adjust to the desired depth and then tighten the screw.

Summary of content (2 pages)