Manual

CAT 6 & CAT 5e Data Patch Panels
INSTALLATION INSTRUCTIONS
888-ASK-4ICC csr@icc.com icc.com
© Copyright 2010, ICC. ICC and ICC logo are registered trade name and trademark. All rights reserved. 1110 MSR-0484-Rev B
Step 1. Choose between TIA-568-A or TIA-568-B wiring configuration. Step 2A. Terminate conductors using a single blade punch down tool.
Step 2B. Terminate conductors using a four pair punch down tool. Step 3. Use supplied cable ties to secure cable bundles.
Optional. Install cable management in front of the patch panel. Optional. Install metal cable management panel in rear of the patch
panel.
Optional. Install plastic cable management bar in rear of the patch
panel.
Optional. Install retention cap onto
IDC.
Optional. Identify each port
with colored icons.
OPTIONAL ACCESSORIES

Summary of content (2 pages)