ICMPP12F5E(6E) Instructions
888-ASK-4ICC csr@icc.com icc.com
© Copyright 2013, ICC. ICC and ICC logo are registered trade name and trademark. All rights reserved. MSR-0525-RevA
INSTALLATION INSTRUCTIONS
Front Access Zero U Patch Panels
Step 4. Terminate conductors using a single blade punch down tool.Step 3. Choose between TIA-568-A or TIA-568-B wiring confi guration.
Step 6: Place the cover back onto the base.Step 5. Route cables to the side and secure them with cable ties (included).
Step 2. Mount the base to a wall or rack and secure with screws. Note:
Mounting to a rack will overlap 6 rack mount spaces.
Step 1. Remove the cover by pressing tabs inward and lifting up.
RackWall
Cable tie
87632145
Brown
White / Brown
Orange
White / Orange
Green
White / Green
Blue
White / Blue
87632145
Brown
White / Brown
Green
White / Green
Orange
White / Orange
Blue
White / Blue
T-568-A Wiring T-568-A Wiring
Untwist .50” Max.
Base
Cover
Tabs