Manual

888-ASK-4ICC csr@icc.com icc.com
© Copyright 2011, ICC. ICC and ICC logo are registered trade name and trademark. All rights reserved. MSR-0499-RevA
INSTALLATION INSTRUCTIONS
Category 5e/6 Mobile Patch Box
Step 1: Disassemble lower body from upper body.
Step 4: Use the supplied cable ties to secure the cable
bundle.
Step 2: Determine between TIA-568-A and TIA-568-B
wiring. IMPORTANT: For maximum performance, minimize
the untwisting of individual pairs to 0.50” maximum.
Step 5: Place lower body on top of upper body. Make
sure strain relief is properly seated. Use screws to secure.
Step 3: Place upper body face down on a at and rm
surface. Pass cable through the strain relief boot. Lay
the wires on the 110-type IDC and terminate them using
a single blade punch down tool.
Step 6: To access ports, ip dust covers open. Dust cover
can be completely removed and a label may be
placed in area provided.
Optional: Use #6 screws (not sold by ICC) to mount box to a wall or at surface.
Optional: To mount the mobile patch box on a metal surface, install magnets (not
included) into open slots inside the lower body.
Magnets
Single Blade Punch Down Tool
Strain Relief Boot
IMPORTANT!

Summary of content (2 pages)