User Guide
Mode of Operation
Power must be applied at all times. Upon closure of the initiate
switch, the delay on make period begins. Once complete, the
contacts transfer and remain transferred as long as the initiate
switch is closed. When the initiate switch opens, the delay on
break period begins.
Once complete, the
contacts return to their
original state and all time
delays reset. If the initiate
contact re-closes during
the delay on break period,
the contacts remain
transferred and the delay
on break is reset.
Removal of input power
resets all timing functions.
Should the initiate contact open during the delay on make period,
the delay on make period is reset to zero.
Delay on Make/Delay on Break
Connection Diagrams
Single Pole Output
1 FORM C
Double Pole Output
2 FORM C
Mode Switch,
DOM/DOB
(See programming
instructions on P.10)
A
ON
B
C
8
TIME
INITIATE
SWITCH
0
V
LOAD
VOLTAGE
INITIATE SWITCH
CLOSED
INITIATE SWITCH
OPEN
TIME
DELAY
TIME
0
V
DELAY
ON BREAK
PERIOD
DELAY
ON
MAKE
PERIOD
LOAD ENERGIZED
Input
Initiate
Switch
Input
Initiate Switch