Installation Sheet

4
watchpoint
The installation must be performed in accordance with all
National and Local Building & Electrical Codes and any
local amendments. Turn o the electrical supply to avoid
risk of electric shock.
2. SUBFLOOR PREPARATION
1. ELECTRICAL ROUGH-IN
1. Install a suitable power supply to a single gang box at the
desired location for thermostat. (110V for areas up to 110 sq ft
or 220V power for larger heated areas)
2. Run a conduit from the electrical box down to subfloor & leave
a pull wire inside conduit. (some areas require a separate
conduit for thermostat sensor wire-check local codes)
1. Ensure that suitable backer board is fastened down as per
manufacturers specifications.
2. Ensure that the subfloor does not have flex or movement.
3. Ensure subfloor is dust free.
installers tips
Prime backer board with self-leveling primer. (if that is
the method to be used for covering heatmat)
cosyfloor mat system
installation guide