Installation Instructions

14
Refer to Figures 12-S, 13-S and 14-S for
reinforcement of full vision sections. After full
vision sections are in place, refer to the
general instructions for completion of your
installation.
Sometimes, higher than standard wind
loading requires a bridge strut (aluminum
angle with offset plates). (FIG. 14-S)
Fig. 13-S
Fig. 14-S
4" x 6" Offset
Plate
Bottom Rail
Full Vision
Inter-mediate
Top Rail with
Built-in Rib
#14 x
3
/4"
Self-Drilling
Screw
2" x 2"
Aluminum
Angle
1
/4" x
3
/4" Hex Bolt &
1
/4" Flange Nut
Door Width What Is Needed For
1
/8" Thick Glazing
Up to 11'2" None
11'4" to 12'2" None
12'3" to 14'2" One 1
1
/4" x 1
1
/4" x
1
/8" angle per section
14'3" to 15'2" One 1
1
/4" x 1
1
/4" x
1
/8" angle per section
15'3" to 16'2" One 1
1
/4" x 1
1
/4" x
1
/8" angle per section
16'3" to 18'2" One 2" x 2" x
1
/8" angle per section
18'3" to 20'2" One 2" x 2" x
1
/8" angle per section
20'3" and Over One Bridge Strut per section
Door Width What Is Needed For
1
/4" & Insulated Glazing
Up to 11'2" None
11'4" to 12'2" One 1
1
/4" x 1
1
/4" x
1
/8" angle per section
12'3" to 14'2" One 1
1
/4" x 1
1
/4" x
1
/8" angle per section
14'3" to 15'2" One 2" x 2" x
1
/8" angle per section
15'3" to 16'2 One 2" x 2" x
1
/8" angle per section
16'3" to 18'2" One Bridge Strut per section
18'3" to 20'2" One Bridge Strut per section
20'3" and Over One Bridge Strut per section
REINFORCEMENT SCHEDULE
Full Vision Intermediate