Installation Instructions

21
TWO SPRINGS ON A SOLID SHAFT SHOWN
VIEW “E”
Solid Shaft
Righthand
Black Drum
Solid Shaft Key
Inserted Into Left
& Righthand
Drums
(2) Set
Screws
(2) Set Screws
Spring
Anchor Plug
Coupler –
See View
“F”
Spring Anchor
Bracket
Warning Tag
(2) Set
Screws
End Bearing Plate
Righthand
Black
Drum With
Set Screws –
See View “E”
Black
Winding
Cone
(Wind
Counter-
clockwise)
Left
Wound
Spring
Spring Anchor Bracket
Right Wound Spring
Red Winding Cone
(Wind Counterclockwise)
End Bearing
Plate
VIEW “F”
Solid
Shaft
(4) Set
Screws
Coupler
Solid Shaft
Solid Shaft Key
1) Insert Solid Shafts Into Coupler
2) Insert Solid Shaft Key
3) Tighten Set Screws
Fig. 2-TOR
1" O.D. Split Solid
Steel Shaft
Lefthand Red
Drum – See
View “E”
3
/8" Bolt & Nut
(4 places)
1" O.D. Solid Shaft
Spacer
Heavy Duty Bearing
End Bearing Plate
Cable Drum
HEAVY DUTY
BEARING
MOUNTING
SYSTEM
(Used for special applications)
Step 1: Attach heavy duty bearing to end
bearing plate with (4)
3
/8" bolt and nut—making
sure that bolt head is toward cable drum as
shown in diagram.
Step 2: Slide cable drum, then spacer, and
then bearing plate (with attached bearing) onto
the shaft.