User's Manual

Product Manual
ESC1000 Downlight/LED Smart Connector
ND 8202-1 11/2015 Users Manual ESC1000 Emerge Downlight/LED Smart Connector Page 3
www.idealindustries.com
Connector.
LOAD Connector
The LOAD Connector accepts 18 AWG copper conductors, solid or stranded (16 strands
or less).
Use only one conductor per port and ensure that no copper is exposed on any of the
wires after installation.
1. Strip the wires to 3/8”.
2. Grip the LOAD +24V wire and firmly push conductor into the port marked with the black
stripe. See Fig. 2.
3. Grip the LOAD -24V wire and firmly push conductor into the unmarked port. See Fig. 2.
4. After LOAD wire installation, the load can safely be disconnected and re-connected without
re-installing the wires. To disconnect the load, firmly grip the LOAD connector and pull to
separate it from the main body of the Smart Connector. To re-connect, simply push the
LOAD connector into the corresponding port on the Smart Connector.
DIM Connector
The DIM Connector accepts 18 AWG copper conductors, solid or stranded (16 strands
or less).
Use only one conductor per port and ensure that no copper is exposed on any of the
wires after installation.
1. Strip wires to 3/8”.
2. Grip positive/(+)/purple DIM conductor and firmly push into the port marked “1”. See Fig. 3.
3. Grip negative/(-)/gray DIM conductor and firmly push into the port marked “2”. See Fig. 3.
4. After DIM wire installation, the DIM connector can safely be disconnected and re-connected
without re-installing the wires. To disconnect the DIM connector, firmly grip the DIM
connector and pull to separate it from the main body of the Smart Connector. To re-
connect, simply push the DIM connector into the corresponding port on the Smart
Connector.
Positive/purple/+ conductor
Negative/gray/- conductor
Fig. 3