User's Manual

SYSTEM BREAKDOWN
IDS GeoRadar S.r.l. MNG/2017/009 Rev 1.1 32/ 54
5.11 Spotlight
In the event that the jobsite illumination is not enough, a Spotlight (Fig. 36)
can be connected to the PSU.
Fig. 36 Spotlight