User's Manual
HOW TO INSTALL AN HYDRA-U SYSTEM
IDS GeoRadar S.r.l. MNG/2017/009 Rev 1.1 35/ 54
6.2 HYDRA installation
1. Pull out the Tripod from the transport bag and place it in the
installation point (Fig. 40);
Fig. 40 – Place the Tripod in the installation point
2. Level the Tripod using the three legs and checking bubble level for a
correct installation (Fig. 41). It is suggested to screw the tripod to the
ground using the special holes on the tripod’s feet.
Fig. 41 – Tripod leg and bubble level
3. Pull out the PTU from the transport bag;