User's Manual

IDS Ingegneria Dei Sistemi S.p.A. N°doc: MN/2009/070 - Rev. 1.1
IBIS-L v.02.00 - User manual
14 / 65
All information contained in this document is property of IDS. All rights reserved.
FIG. 3.20 – FRONT (LEFT) AND BACK (RIGHT) VIEW OF THE POWER SUPPLY MODULE. NOTE
THE HANDLES, TWO WHEELS AND THREE LOCKABLE DOORS .........................................35
FIG. 3.21 - SEQUENCE FOR UNFOLDING THE POWER SUPPLY UNIT HANDLES.........................36
FIG. 3.22 –THE NOTEBOOK PC TABLE..................................................................................................36
FIG. 3.23 - THE POWER SUPPLY MODULE SWITCHBOARD.............................................................37
FIG. 3.24 - (A) BATTERY HOUSING AREA, (B) POWER SUPPLY MODULE CONNECTOR AREA
WITH THE GROUND SCREW HIGHLIGHTED.............................................................................38
FIG. 3.25 – PANASONIC CF-19 PC ...........................................................................................................40
FIG. 3.26 – SCHEMATIC DIAGRAM OF CONNECTIONS.....................................................................41
FIG. 4.1 - OPENED IBIS-L BOX ................................................................................................................43
FIG. 4.2 – WING NUTS FIXING THE LINEAR SCANNER ....................................................................43
FIG. 4.3 – (A) POINTING SYSTEM, (B) DEM SPACERS (C) TEMPLATE SPACER............................44
FIG. 4.4 – SEQUENCE FOR REMOVING THE ELEVATION POINTING SYSTEM ............................44
FIG. 4.5 – IBIS-L CASE ..............................................................................................................................45
FIG. 4.6 – IBIS-L CASE - INTERNAL VIEW............................................................................................46
FIG. 4.7 – IBIS-L CASE - INTERNAL VIEW............................................................................................46
FIG. 4.8 – VIEW OF THE TEMPLATE PLACED ON THE BASE...........................................................47
FIG. 4.9 – MOUNTING THE STUDS ON THE TEMPLATE, DETAIL OF THE CENTRAL PLATE
WITH THE SPACER AND ITS TWO STUDS .................................................................................48
FIG. 4.10 – RESIN INJECTION OPERATION...........................................................................................48
FIG. 4.11 – MOUNTING THE BASE WASHERS .....................................................................................49
FIG. 4.12 – THE CORRECTLY INSTALLED POSITIONING FORK......................................................50
FIG. 4.13 – SEQUENCE FOR MOUNTING THE SPHERICAL THRUST BEARINGS ..........................50
FIG. 4.14 – MOUNTING THE FIXING PLATE TO THE SPHERICAL HOUSING ................................50
FIG. 4.15 – CONTACT BETWEEN THE SPHERICAL HOUSING AND THE SPHERE. LEFT SHOWS
THE CORRECT POSITION, CENTRE SHOWS THE SPHERE POSITION TOO HIGH, RIGHT
SHOWS THE SPHERE TOUCHING THE BOTTOM OF THE HOUSING ....................................51
FIG. 4.16 – STEPS 16 TO 18 .......................................................................................................................52
FIG. 4.17 - POSITIONING THE ELEVATION POINTING SYSTEM ONTO THE LINEAR SCANNER53
FIG. 4.18 – CORRECTLY INSTALLED ELEVATION POINTING SYSTEM (A) WITHOUT AND (B)
WITH THE DEM SPACERS .............................................................................................................53
FIG. 4.19 - LEFT AND CENTRE: DETAIL OF THE IBIS SENSOR CONNECTOR. RIGHT: TWO
PROTECTIVE CAPS FOR THE CONNECTORS.............................................................................54
FIG. 4.20 – CONNECTIONS BETWEEN IBIS SENSOR - LINEAR SCANNER –POWER SUPPLY
MODULE -PC ....................................................................................................................................55
FIG. 4.21 – FULLY INSTALLED IBIS-L SYSTEM ..................................................................................55
FIG. 5.1 - OPENING WINDOW OF THE CONTROL AND ACQUISITION SOFTWARE.....................57
FIG. 5.2 – THE CONFIGURATION PANEL..............................................................................................58
FIG. B. 1 – SCHEMATIC DIAGRAM OF THE ANTENNA BEAM.........................................................64
FIG. B. 2 – AREA OF THE SCENARIO COVERED BY THE ANTENNA BEAM MAIN LOBE. .........65