User's Manual

IDS Ingegneria Dei Sistemi S.p.A. N°doc: MN/2009/070 - Rev. 1.1
IBIS-L v.02.00 - User manual
48 / 65
All information contained in this document is property of IDS. All rights reserved.
Fig. 4.9 – Mounting the studs on the template, detail of the central plate with the
spacer and its two studs
10. mount the two shorter studs on the spacer with the nut, lock nut and M16 washer (Fig.
4.9) so they protrude from below the template the same distance as the other three studs
(all 5 studs must touch the ground at the same time);
11. minimising the protrudance of the three regulating screws, replace the template with these
studs onto the base, inserting the studs into the previously drilled holes and ensuring that
all the studs enter easily into the holes without any obstacles;
12. move the studs fixed to the template in and out of the holes on the base several times to
ensure that they enter well to the correct depth (widen the diameter of the holes if
necessary);
13. use the template regulating screws to fix the height position of the studs so that they
penetrate about 7-8 cm inside the respective holes;
14. place the template in the exact position and level it using the three regulating screws;
15. remove the template from the base, keeping all the studs and screws attached to it;
Fig. 4.10 – Resin injection operation