User's Manual

IDS Ingegneria Dei Sistemi S.p.A. Protocol: MN/2009/030 - Rev. 1.2
Safe Rail System Data Acquisition Software
46
/
76
Fig. 4-25 – Setting up a New Acquisition
!
NOTE
Once you have defined the name of the new acquisition, a new folder
is automatically created with this name and the
.zon
extension in the
C:\SRS_PLUS\M ission\*.mis\*.zon directory, as shown in Fig. 4-26
:
the example shows the C:\SRS_PLU S\M ission\Castle.mis\*.zon
directory.
Fig. 4-26 – The Castle.mis folder directory
6.
Pressing the button returns to the calibration phase
window shown in Fig. 4-7.
7.
Pressing the button in the window shown in Fig. 4-7
closes the software; before shutting down the software, the message
window shown in Fig. 4-18 reminds you to disconnect the Control Unit.
4.5 Setting the acquisition parameters
Once the names of the survey and acquisition have been chosen, you can pass
straight on to the data acquisition phase.