Safety Information

www.tuv.com
Page 28 of 59
Report No.: 50261218 001
IEC 60950-1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IEC60950_1G
5.3.9.2
After the tests
No reduction of clearance and
creepage distance. Electric
strength test is made on basic,
supplementary and reinforced
insulation after test.
P
6
CONNECTION TO TELECOMMUNICATION NETWORKS
N/A
6.1
Protection of telecommunication network service persons, and users of other
equipment connected to the network, from hazards in the equipment
N/A
6.1.1
Protection from hazardous voltages
N/A
6.1.2
Separation of the telecommunication network from earth
N/A
6.1.2.1
Requirements
N/A
Supply voltage (V) .........................................:
¾
Current in the test circuit (mA) ........................:
¾
6.1.2.2
Exclusions ....................................................:
N/A
6.2
Protection of equipment users from overvoltages on telecommunication
networks
N/A
6.2.1
Separation requirements
N/A
6.2.2
Electric strength test procedure
N/A
6.2.2.1
Impulse test
N/A
6.2.2.2
Steady-state test
N/A
6.2.2.3
Compliance criteria
N/A
6.3
Protection of the telecommunication wiring system from overheating
N/A
Max. Output current (A) ..................................:
¾
Current limiting method ...................................:
¾
7
CONNECTION TO CABLE DISTRIBUTION SYSTEMS
N/A
7.1
General
N/A
7.2
Protection of cable distribution system service
persons, and users of other equipment connected
to the system, from hazardous voltages in the
equipment
N/A
7.3
Protection of equipment users from overvoltages
on the cable distribution system
N/A
7.4
Insulation between primary circuits and cable
distribution systems
N/A
7.4.1
General
N/A
7.4.2
Voltage surge test
(see appended table 5.2)
N/A