Home Gym User Manual
Table Of Contents
- BEFORE YOU BEGIN...................................................................................... 1
- IMPORTANT SAFETY NOTICES..................................................................... 2
- HARDWARE PACK……….....…....................................................................... 4
- ASSEMBLY INSTRUCTIONS...............................................................….......... 7
- PARTS LIST…………………………………………………………….……….……. 34
- RESISTANCE CHART………………………………………………………………. 35
- WARRANTY.................................................................................................… 36
- ORDERING PARTS......................................................................................... 36
- DIAGRAM 3
- DIAGRAM 4
- DIAGRAM 5
- 21
- DIAGRAM 11
- DIAGRAM 13
- KEY NO. DESCRIPTION Q’ty
- Station
- Station

STEP 2 (See Diagram 2)
A.) Attach the Right Upper Frame (#1) onto the Right Vertical Frame (#4). Secure it with two M10 x 2
¾” Carriage Bolts (#98), one 4 ¾” x 2 ¾” Bracket (#25), two Ø ¾” Washers (#100), and two M10
Aircraft Nuts (#102). Do not tighten the Nuts and Bolts yet.
B.) Attach the Right Upper Frame to the four Guide Rods (#16). Secure it to each Guide Rod with
one M10 x ¾” Allen Bolt (#95) and Ø ¾” Washer (#100).
C.) Securely tighten the Nuts and Bolts previously installed.
D.) Attach the Right Seat Support (#7) to the Right Vertical Frame (#4). Secure it with two M10 x 2 ¾”
Carriage Bolts (#98), one 4 ¾” x 2 ¾” Bracket (#25), two Ø ¾” Washers (#100), and two M10
Aircraft Nuts (#102).
E.) Attach the Leg Developer (#8) to the open bracket on the Right Seat Support. Secure it with one
Axle (#15), two M10 x ¾” Allen Bolts (#95), and two Ø ¾” Washers (#100).
9