Owner's Manual
Table Of Contents
- BEFORE YOU BEGIN...................................................................................... 1
- IMPORTANT SAFETY NOTICES..................................................................... 2
- HARDWARE PACK……….....…....................................................................... 4
- ASSEMBLY INSTRUCTIONS........................................................................... 7
- WEIGHT RESISTANCE CHART....................................................................... 28
- PARTS LIST………………………………………………………………………….. 29
- WARRANTY.................................................................................................… 30
- ORDERING PARTS......................................................................................... 30
- WARNING LABEL REPLACEMENT
- HARDWARE PACK
- HARDWARE PACK
- ASSEMBLY INSTRUCTION
- Slide the Right Butterfly (#10) onto the right axle on the Butterfly Base (#13).
- Insert the Butterfly Handle (#9) into the pivot on the Right Butterfly. Secure it with one M10 x ¾” Allen Bolt (#103) and ( 1 ¼” Washer (#70) from the bottom.
- Repeat Procedures A and B above to install the other side. Do not over tighten the Bolts. Make sure the Handles are able to swivel.
- DIAGRAM 5
- Station
- Leg Developer
- Hip/Thigh
- Station
- Leg Developer
- Hip/Thigh
STEP 7 (See Diagram 7 & Lower Cable Loop Diagram)
A.) Attach the 217” Lower Cable (#40) to the opening on the Leg Developer (#8). Attach
a Pulley (#44) to the opening. Secure it with one M10 x 2 ½” Allen Bolt (#98), two ∅
7/8” Leg Developer Pulley Bushings (#56), and one M10 Aircraft Nut (#109).
B.) Draw the Cable underneath the Pulley to the open bracket on the Front Base Frame
(#12). Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#99),
two ∅ ¾” Washers (#111), and one M10 Aircraft Nut (#109).
C.) Draw the Cable underneath the Pulley towards the back of the machine through the
bottom opening on the Vertical Frame (#4) to the open bracket on the Rear Base
Frame (#15). Repeat Procedure B above to install a Pulley.
D.) Draw the Cable underneath the Pulley then pull upward to the Double Floating Pulley
Bracket (#20) previously installed in STEP-6. Repeat Procedure B above to install a
Pulley. After completing the entire cable system, come back to the Double Floating
Pulley Bracket and adjust the height of the lower Pulley to adjust the tightness of the
Cables. Move up the pulley to increase the tension. Move down the pulley to loose
the tension.
E.) Draw the Cable around the Pulley then downward. Attach the Cable to a Single
Floating Pulley Bracket (#18). Repeat Procedure B to install a Pulley.
F.) Draw the Cable around the Pulley then upward to the open bracket on the back of
Vertical Frame (#4). Repeat Procedure B to install a Pulley.
G.) Draw the Cable around the Pulley then downward. Attach the Cable to an Angled
Double Floating Pulley Bracket (#27). Repeat Procedure B above to install a Pulley.
Let the Brackets hanging for now.
H.) Draw the Cable around the Pulley then upward to the opening on the Vertical Frame
(#4). Attach a Pulley to the opening. Secure it with one M10 x 3 3/8” Allen Bolt
(#97), two Pulley Bushings (#53), and one M10 Aircraft Nut (#109).
I.) Insert the Cable through a Ball Stopper (#47). Attach the Cable to a U-shape Cable
Connector (#48). Secure the Connector with one M10 x 1 1/8” Allen Bolt (#100), two
∅ ¾” Washers (#111), and one M10 Aircraft Nut (#109).
18