Owner's Manual
10 
STEP 6 (See Diagram 6) 
A.) Do not tighten Nuts and Bolts until instructed to do so. 
B.) Attach one Front Vertical Frame (#28) to a Rack Base Frame (#27). Secure it from top with 
two M10 x 5/8” Allen Bolts (#45) and two Ø ¾” Washers (#55). Secure it from side with two 
M12 x 3 3/8” Hex Bolts (#44), four Ø 1” Washers (#54), and two M12 Aircraft Nuts (#52). 
C.) Repeat B to install the other Front Vertical Frame on the other side. 
DIAGRAM 6 










