User Manual

Dodge 12/24 Twin Turbo Kit
1. Disconnect both batteries and remove battery & tray on passenger side of the truck.
2. Remove air lter assembly and down pipe out of the vehicle.
3. Remove oil lter.
4. Remove motor mount bolt using a 15mm.
5. Remove negative ground wire from block.
6. Disconnect and remove oil drain from block and replace with new double oil drain and new O-
ring make sure to grease new oil rings.
7. Drain Antifreeze from engine and radiator
8. Install turbo support bracket tight snug ,DON’T TIGHTEN TIGHT. 12v trucks use the supplied
spacer and new bolt 24v does not need spacer behind bracket use stock bolt
9. Remove both upper coolant tubes and hoses from rewall.
10. Cut stock insulation off rewall above new turbo and install new heat shield cut in half and stick
in place save the other half for battery box.
11. Install new steel braded coolant lines with new clamps.
13. Install hot pipe using stock clamp and T6 gasket and supplied bolts NOTE: install one bolt up
through the exhaust housing as shown in picture.
14. Once hot pipe bolts are tight and is adjusted away from the rewall tighten both exhaust housing
clamp and clamp on stock turbo then tighten turbo support bracket bolt tight.