User's Manual

Technical Document
CB951 Installation Guide Page 1 P/N 430697-00 Rev C
CB951 Access Point Installation Guide
The CB951 is a multi-band access point designed to decode radio frequency
transmissions from any of Indyme’s multi-band wireless callboxes. The
signals are relayed, via the LAN, to an Indyme server for processing.
Connections to the CB951 will vary depending on the deployed
configuration. The CB951 can be programmed to function in the 868MHz or
900MHz frequency spectrum. Check your configuration for details.
Installation
The CB951 Access Point is a ceiling-mounted device. Plan the installation
such that each unit has the clearest possible “line-of-sight” to the largest possible expanse of
the sales floor. The CB951 Access Point must be programmed before installation.
Confirm the
correct antenna is installed and all operational parameters have been set prior to installing the
CB951 Access Points. Each unit will require power; this can be supplied via P.O.E. or external
power supply to each unit. (12VDC, 500mA, positive tip, 2.5mm – SOLD SEPARATELY).
Tools Needed:
Drill and assorted Drill Bits
Assorted Screwdrivers (Phillips and Flat Blade)
Wire Cutters
Equipment Needed:
CB951 Access Point
Four (4) pair CAT5 Network Cable
NOTE:
Grey: 868 MHz Europe
Yellow: 900 MHz USA/Australia
* Plan your cable runs to avoid the following potential sources of interference;
DO NOT LAY CABLE ON OR NEAR
Fluorescent lighting fixtures, AC power lines, fan motors or RF transmitters.
* Assure a clear line of sight between the Access Point and installed Callboxes,
avoiding large metallic objects such as storage racks and air ducting.
* Leave at least 15 feet of excess cable at the Access Point location, in the
event that the unit needs to be relocated.
* Do not bundle the cable with other data cables, as “bleed-over” may occur,
causing interference.

Summary of content (3 pages)