Product Info
Table Of Contents
- About This Manual
- Important Notice
- Introduction
- Document structure
- Document marks
- Key Features
- Hardware Platform
- Power supply
- Lightning protection unit
- Synchronization unit
- // 0) { /* For each inline-commented element clear data-ref and class */ for (var i=0; i < commentedElements.length; i++) { commentedElements[i].dataset.ref= ""; commentedElements[i].className = ""; } } /* Else do nothing */ } }); //]> AUX-ODU-SYNC Mounting
- AUX-ODU-SYNC Cable gland Assembling
- AUX-ODU-SYNC Connection to ODU
- Packing List
- Planning considerations
- Link Pre-configuration in the lab
- Installation
- Operation & Administration
- Troubleshooting
- Glossary
Infinet Wireless: Technical Documentation – InfiMAN Evolution
Link Pre-configuration in the lab – 46
1.
2.
3.
4.
5.
1.
2.
3.
5 Link Pre-configuration in the lab
Usually, before going into the field, it is recommended to pre-configure in the lab the Infinet Wireless units to verify
the link establishment. Take the units out of the package and place them on the table.
Step 1: Scheme connectionassembling
The equipment list required for the lab configuration:
Outdoor units - 2 pcs.
Power supply - 2 pcs.
Power cord - 2 pcs.
Ethernet cables - 4 pcs.
Laptop with Ethernet port available.
We will perform the settings mentioned below for each unit andcheck if the wireless link was established correctly.
Use the following instruction to assemble a test scheme:
Connect Gigabit Ethernet portat the ODU to the power supply port labeled as "OUT".
Connect Ethernet portat the laptop to the power supply port labeled as"IN".
Connect the power cord to power supply and plug it to AC mains.
•
•
•
NOTE
A minimum set of requirements must be met during devices pre-configuration in the lab:
Make sure that devices are positioned in such a way so that they are not directed right at each other
to prevent device damage.
In case of connectorized model configuration, it is recommended to connect the two devices in the
link directly, with RF cables and RF attenuators with attenuation of at least 40 dB for each
polarization (installation\deinstallation of the RF attenuators and RF cables should only be
performed when the devices are switched off).
In case an external antenna or the other unit in the link is connected to only one N-type connector
do not switch on the unit.