Installation and Assembly All-in-one Projector Adapter Plate for Model: SP-CAL-011 inFocus® Projectors “This product is Intended for ise with UL Maximum Load Capacity: Lister products and must be satiated US by squatted professions instar. Read instruction sheet before you start installation and assembly. installer must verify that the ceiling will safely support the combined weight of projector mount and projector. IMPORTANT! Turn to the appropriate page for your ceiling installation.
Before you start check the pairs fist to insure all of the parts shown are included, Parts List Description A ball and socket mount Part Number 055-0011 520-1151 Cession 580-1042 FASTENERS Note: Actual parts rey appear slightly different than Frustrated. f 20f8 ISSUED: 1.5.04 SHEET #: 055-9196-1 | Visit the In Focus Web Site at www.infocus.
Installation To Wood Joist Finished Ceilings, Exposed Wood Joists, or Wood Beam Ceilings Drift two 5/32" (4 mm) dia. holes to a minimum depth of 2.5” (84 mm). Attach ceiling plate {(G) ~7 with two #14 x 2.5% wood screws (F} as shown using 3/8" (10 mm) socket wrench. Tighten wood screws (F} so ceiling plate {G) is firmly attached. DO NOT TIGHTEN WITH EXCESSIVE FORCE! Over-tightening can cause stress damage to wood screws (F) greatly reducing their holding power! Tighten ELM) maximum torque.
Installation to Concrete Ceilings Alligator” concrete anchors are recommended. Drill two 1/4" {6 mm) dia. holes to a minimum depth of 2.8" (64 mm). Attach ceiling plate {G) using two concrete anchors and #14 x 2.5" wood screws {F} as shown in Frustration A and 1, 2, and 3 (below). Tighten all fasteners. IMPORTANT: it is the responsibility of the installer to verify that the ceiling will safely support the combined load of ali attached hardware and components.
Flush Mount Installation Screw ball and socket mount {A} into ceiling plate (G). Align the notch with one of the four holes of the ceiling plate (G) and secure ball and casket mount (A) with socket pin screw (C) using security Allen wrench (B) as shown in detail 1. Note: Slotted set screw (K) is used to jam against the threads of the ball and socket mount to prevent any excess movement of the ball and socket mount (A).
Installation to Extension Column © Screw extension column to ceiling plate (G). Align the notch with one of the four holes in the ceiling plate (G) and secure extension column with socket pin screw {C) using security Allen wrench (B). See detail 3. Screw extension column connector {to extension column. Align slot in extension column with one of the top holes in extension column connector (1).
Note: The projector you are installing may differ in appearance from the sample illustrated below. Attach projector to the ball and casket mount (A) by inserting the ball and socket mount (A} into the adapter plate connection and twisting until the adapter plate will no longer turn (about 75°). The spring loaded captive screw should line up with a corresponding hole on the adapter plate (this should line up automatically when the two are connected).