User Manual

PowerBASEâ„¢ Owners Manual 99300787-i
11
Note: if adjustable bed is to be set up
without a headboard, basic installation
is now complete. If headboard is to be
installed, proceed to Headboard Bracket
Installation.
b. Place mattress retainer ends into
grommeted holes in top surface of
adjustable bed base (FIGURES 13
and 14). Press down until horizontal
retainer section is flush against bed
base.
FIGURE 13: Mattress retainer installation.
MATTRESS
RETAINER
FOOT END OF BED BASE
Tooless Mattress Retainer
10b. Install mattress retainer at the foot end
of the bed base as follows:
a. Locate grommeted holes at foot of
bed base (FIGURE 12).
GROMMETED
HOLES
FIGURE 12: Grommeted hole locations.
FOOT END OF BED BASE
INSTALLATION
h. Tighten all mattress retainer bolts
with a 7/16 inch wrench or socket.
Note: do not overtighten.
FIGURE 11: Typical twin size Profile-DC shown with
mattress retainer installed.
DO NOT USE POWER SCREWDRIVER TO
INSTALL MATTRESS RETAINER. DO NOT
OVERTIGHTEN MATTRESS RETAINER
HARDWARE!
NOTE