Manual

10
S-Cape II MR Hand Control Operation Guide
The six step procedure below is required to separate 2 hand controls from operating 2
beds. One hand control per bed operation will result. Before beginning, make certain the
beds are plugged into a working grounded electrical outlet.
STEP 1
On bed 1, press the learn button for 1
second and release. The bed will be
equipped with either a power down box or
J box (FIGURE 1).
STEP 2
On hand control 1, simultaneously press and
hold the
Pos 1 and the head massage on/off
buttons. The transmission indicator light will
flash slowly and then flash rapidly. Continue
to hold for 2 seconds and then release the
buttons (FIGURE 2).
STEP 3
Repeat Step 1 and Step 2 with hand control 1.
Note: wait 90 seconds before proceeding to
Step 4.
STEP 4
On bed 2, press the learn button for 1
second and release. The bed will be
equipped with either a power down box or
J box (FIGURE 1).
STEP 5
On hand control 2, simultaneously press and
hold the
Pos 1 and the head massage on/off
buttons. The transmission indicator light will
flash slowly and then flash rapidly. Continue
to hold for 2 seconds and then release the
buttons (FIGURE 2).
STEP 6
Repeat Step 4 and Step 5 with hand
control 2.
Independent hand control operation is
now restored (hand control 1 operating
bed 1; hand control 2 operating bed 2).
FIGURE 1: Power down box and J box receiver units.
J BOX
POWER
DOWN BOX
LEARN
BUTTON
LEARN
BUTTON
NOTE: POWER
DOWN BOX IS
NOT MOUNTED
TO BED FRAME.
J BOX IS
MOUNTED TO
THE BOTTOM
SIDE OF THE
BED FRAME.
HAND CONTROL
BED 1
HAND CONTROL
BED 2
FIGURE 2
TRANSMISSION
INDICATOR LIGHT
HEAD MASSAGE
ON/OFF BUTTON
POS 1 BUTTON
S-CAPE II MR REPROGRAMMING separating 2 beds