Owner Manual

General Information prior to installation :
1. Panels can be installed vertically or horizontally.
2. Panels can be installed with the panel’s ragged edge turned towards the other panel’s ragged edge or to a panel’s straight edge (either way the panels overlap).
3. Prepare a detailed plan, measure the area planned to be covered to determine how many panels you will need prior to cutting and installing.
4. Surface and panels must be clean, dry, smooth and free of dust, grease, wax and or any other particles prior to installation.
5. Clean the back surface of the panel, use a clean cloth and rubbing alcohol.
6. Adhesives - Use high quality, strong, one component adhesive and sealant based on MS polymer 5.
Recommended Adhesives:
Durabond D-745 (Class A Fire Rated)
Liquid Nails LN 950
Liquid Nails FRP-300
DAP Weldwood FRP
Locktite PL Premium
Locktite PL Premium Advance
Installing the Panels:
Step 1: Prepare a detailed plan, in accordance with your chosen option.
Step 2: Cut the panel’s edge according to the markings, and in accordance with the option chosen in Step 1.
Step 3: Apply adhesive onto the high points at the panels’ back side. Use one of the recommended adhesives.
Make sure you apply the adhesive on all spots as well as onto the overlap between the panels.
Step 4: Please pay attention to the connection between the panels, it is important to use an adhesive in the connection between the overlapping panels.
Step 5: Press the panels to the wall with your ngers and use a masking tape.
Step 6: Pay attention to the overlapping and attachment of the panels.
Step 7: If the panels need cutting, please do so in advance using scissors or a utility knife.
Step 8: After installing all the panels and applying masking tape in order to hold them in place, wait for 24 hours until the adhesive dries totally prior to removing
the masking tape.
EN