Programmer's Manual

Table Of Contents
Programmer Model 2740 English 25
Testing Connection Strength
Complete the following steps to evaluate programmer head positioning before connecting to the generator.
Start the process from either the programmer cable or tablet.
Starting the process from the programmer cable:
1. Ensure the programmer cable is connected to power.
2. Position the programmer head directly over the generator (Figure 3-7).
3. Press the Test Connection button on the controller.
4. The strength gauge will display one of the following ratings in Table 3-2.
5. If signal strength is not good, reposition the programmer head directly over the generator for a
stronger signal or remove the source of interference.
6. Wait 30 seconds for the process to end or press the Test Connection button, again, to cancel.
Starting the process from the tablet:
1. Ensure that the tablet and programmer cable are on.
2. Confirm that a wireless link between the tablet and programmer cable has been established by
checking the programmer cable status line in the screen footer.
3. Position the programmer head directly over the generator (Figure 3-7).
4. Select the Test Connection button on the Start screen or on a screen within a programming session.
5. The screen will display one of the following strength ratings shown in Table 3-2.
6. If signal strength is not good, follow the on-screen instructions:
reposition the programmer head directly over the generator for a stronger signal, or
remove the source of interference.
7. Select the Done button when the programmer head is positioned properly and the communication
strength has reached a rating of good shown in Table 3-2.
Table 3-2. Communication Strength Ratings
Good
Moderate
Low