User's Guide
46
OW70L-Dac - OneWeb LEO User Terminal
Chapter 10. Appendix
10.1 Appendix A. Pre-Installation Checklist
This pre-installation checklist describes important considerations before installing the UT. It must be
completed by the certified installer to install in a safe location. Please fill out the general information below.
Date of Survey:
Date of Install (If different from installation date):
Installer Information
• Company Name:
• Installer’s Name:
• Contact Phone Number:
• Address:
• Email:
Customer Information
• Organization Name:
• Customer Name:
• Phone Number:
• Address:
• Email:
• Site Location (Lat / Long.):
• UT Type Being Installed (w. CNX):
The following checklist is to be completed by the Installer.
Building / Site checklist
Check Item Result
The proposed antenna mount type is checked. (Roof Mount / Ground Mount /
Ground Level Pole Mount / Pole Mount Bolted to Wall / Custom Mount / Etc.)
(Fill out)
The location of the site is checked. (Urban / Semi-urban / Rural / Remote)
(Fill out)
The building external wall composition is checked. (If mounted on the building)
Yes / No / N/A
The visibility of the antenna to the public is checked.
Yes / No / N/A
The safety from unauthorized access is checked.
Yes / No / N/A
The roof space/floor space availability based on mount type is checked.
Yes / No / N/A
The roof/soil composition based on mount type is checked.
Yes / No / N/A
The lightning protection availability is checked.
Yes / No / N/A
Expected Obstructions / Possible Interference checklist
Check Item Result
The field of view to satellite constellation is checked.
Yes / No / N/A
The no interference with RF transmitters is checked.
Yes / No / N/A
The no interference by high voltage lines, power cables, and telephone cables is
checked.
Yes / No / N/A
The no other possible sources of interference are checked.
Yes / No / N/A
The map of no obstruction is checked. (Also updated into UT configuration as an
array of AZ, EL coordinates.)
Yes / No / N/A










