User Manual

Technical Manual for Master Terminals of the Series IF 152x
Page 18
Installation Specifications
Master terminals for time and attendance recording are mounted close to where employees work.
To ensure proper installation, we recommend an "on-site inspection" with the future operator of the
system and the preparation of an installation plan.
The plan should include information on the following:
Mounting location of the master terminal, installation height.
Connecting cables required, cable layout and cable types.
Mounting Location
Master terminals are designed for vertical wall mounting. They require an even mounting surface of
210 mm x 239 mm.
For terminals with protection category IP 32, we recommend locations that are as dry and dust-free as
possible, an ambient temperature of + 4°C to max. +50°C. Locations which are directly exposed to
incidence, isolation, electrostatic charging or extraordinary mechanical loads are to be avoided.
Laying and Feeding of the Connection Cables
The cables for the power supply can either be wall- or flush mounted. Certain network cable
installations, however, are exceptions. They are connected to the master terminal from the outside via
patch cable.
# Lay the connecting cables directly and/or via line distributor to the mounting location.
# Let the cables jut out approx. 40 cm at the mounting location of the master terminal.