Specification
XXXXXXXXXXXXXXXX
Energy Controls
ET1100 Series
Diagrams
1
Neutral
120 VAC
Input
Line
2 3 4
Timer Power
Load
Install jumper
only if timer input
and load voltage
are the same.
1
L2
L1
2 3 4
Timer Power
Load 1
Load 2
Install jumper
only if timer input
and load voltages
are the same.
5
1
L2
240 VAC Input
L1
2 3 4 5 6
Timer Power
Load
Configuration jumper set to “SIM”.
1
L2/Neutral
L4/Neutral
120/208/240/277
VAC Input
L1
2 3 4 5 6
Load
1
Timer Power
Load
2
L3
L5
Configuration jumper set to “IND”.
L6/Neutral
1
L2/Neutral
L1
2 3 4 5 6
Timer Power
ON Pulse
OFF Pulse
Maintained
Contactor
COM
CLOSE
OPEN
Configure jumper set to “PUL”.
ET1105-120 VAC-SPST
ET1115-SPDT (load switching)
ET1125-240 VAC-DPST ET1125-Pulse 2x SPST
ET1125-2x SPST
1
L2/ Neutral
L1
2
Timer Power
Load
Configuration jumper set to “PUL”
Each event, ON or OFF, Rings Bell.
3 4 5 6
ET1125-Pulse 2x SPST (bell ringing)