Owner's Manual
2
(Or holiday group for “no load operation”)
If holidays are not required, press PROG and proceed to Programming
Load Operation for Fixed Times.
Holidays can be one day or several days in duration.
Holiday rules: 1) Holidays cannot overlap each other.
2) Holidays must end on or before December 31st. Example:
AholidayfromDec.4–Jan.7wouldbeenteredas2holidaysDec.24–
Dec.31andJan.1–Jan.7.
First Holiday
• Selectareferencenumber(thisissimplyanumberfrom1to99usedto
keep track of the holidays). Example: press 1.
• PressOK.
• Selectthemonthanddaytostarttheholiday(yearisnotrequired–the
same day will be used every year until revised).
Example:July4–press7,0,4.
• PressOK.
• SelectthemonthanddaytoendtheholidayorpressOK for a holiday
of1dayduration,forexampleaholidayendingonJuly4th.
SET-UP, cont’d
Creating a Holiday, cont’d
2
WED
4
SAT
7
ALL
0
SUN
1
OK
OK
OK