User's Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
Chapter 2. Prior to Installation
8
List of Materials, Continued
Power modules
& connectors
The following table shows the power modules & connectors:
All StreetNode 6250 PTP models are provided by the
manufacturer with an AC or a DC power module pre-installed
on them.
However, the power modules can be ordered separately and
installed on the radio unit by the customer, if power input
modification is required.
(1)
An AC or DC power connector is included in the radio
equipment package depending on the power module pre-
installed on the radio unit (AC power module or DC power
module, respectively).
However the power connectors can also be ordered separately
if required.
Item
Order Code / Photo
Description
A
ST-PSU-AC
AC power module, 90 VAC to 240 VAC,
outdoor, IP67 ingress protection.
B
ST-PSU-AC
DC power module, outdoor, IP67 ingress
protection.
C
ST-CONN-AC
AC power connector, three terminals, solder
type,
IP68 ingress protection, UV-rated, industrial
type.
For use with the 3 x 0.75 mm
2
cable (AC-PWR-
CAB order code).
D
ST-CONN-DC
DC power connector, two terminals, solder type,
IP68 ingress protection, UV-rated, industrial
type.
For use with the 2 x 1 mm
2
cable (DC-PWR-
CAB-1 order code).
Continued on next page
(1)
The customer needs to be trained to perform power module replacement.