User's Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
Chapter 2. Prior to Installation
22
Safety Precautions, Continued
• LOCAL POWER AC SOURCE
• Safety requirements require a single pole circuit-breaker to be
employed between the local power AC source and StreetNode
TM
6250
PTP (for AC direct powering) or AC power injector.
• The circuit breaker must disconnect the mains phase of the AC power.
• LOCAL POWER DC SOURCE
• Safety requirements require a single pole circuit-breaker to be
employed between the local power DC source and StreetNode
TM
6250
PTP (for DC direct powering) or DC power injector.
• The circuit-breaker must control (open / close) the negative (-) V pole of
the power supply.
• The positive pole of the local power source must be grounded.
For circuit breaker requirements please refer to Circuit breakers on page 28.
• POWER SUPPLY CABLES (AC/DC)
• Power source cables must be tested for short circuits, open circuit or
wrong wiring before installed.
• The ground wire of the AC power source cable must be connected to
the protective earth (ground) point of the mains electricity installation.
AC or DC Power PROPER SWITCHING ON / OFF
Never connect or disconnect the power cable to or from the radio unit as well
as the power injector when the local power supply sources (AC or DC) is
ON.
There is risk of equipment failure.
Continued on next page