User's Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
Chapter 2. Prior to Installation
24
Site Prerequisites
Introduction
This paragraph describes all the prerequisites that must be considered prior
to installing the equipment.
Site survey
Site survey should be done before start the installation taking in
consideration the following:
Premises information
• Site details (address, contact persons, GPS and/or map co-ordinates, etc.)
• Site access and storage information (means of transport, equipment
storage and lifting information, etc.)
• Site location maps
Network planning
• Site Coordinates
• LOS verification
• Rooftop information (height, status, access, dimensions, layout, etc.)
• Information about pre-existing indoor/ outdoor equipment
• Available mounting space (on the buildings’ roofs) to reserve for the
installation of the outdoor equipment
Site-specific information
• Mechanical specifications of masts/ towers (type, dimensions/ diameter,
material, exterior finishing, etc.)
• Location of appropriate grounding points (bar or terminals).
• Location of appropriate power supply distribution points.
• Location of cable conduits available for routing the cables.
• Location of the network port distributors.
• Total length of the cables required.
The site survey report must be agreed and signed between all
involved parties.
Continued on next page