Site Prerequisites, Continued
Preparation of
the installation
premises
Access to the installation premises must be facilitated during the installation
period.
Entrances must be large enough to enable the easy transportation of the
new equipment.
The floor must be level, smooth and able to bear the load of the equipment.
The roof must be engineered to bear the weight of the service personnel and
the outdoor equipment.
Network port
distributors
Regarding the network ports provided by the equipment, suitable optical (or
electrical) network port distributors should be available.
The exact location of the network port distributors, as well as the network
ports to reserve, should be known prior to installing the equipment.
Also, all the reserved ports on the network port distributors should be
qualified and tested before realizing the network connections with the
equipment.
Cables routing
(lamp post)
When the StreetNode
TM
6250 PTP is installed onto a lamp post then all the
cables must be routed downwards from inside of the lamp post.
Power cable
routing
Routing of AC or DC power supply power cable should be implemented as
prescribed by the local regulations regarding outdoor electrical installations.
Cable conduits
Appropriate cable conduits should exist for the routing of installed cables.