User's Manual

Table Of Contents
Chapter 3. Installation of StreetNode 6250 PTP
50
Mechanical Installation & Grounding, Continued
Building Wall
installation
procedure,
continued
Step
Action
6 Perform the following:
a. Use the spanner 8 mm for fastening StreetNode
TM
6250
PTP onto the mounting plate.
Do not over tighten screws. Adjust the spanner for
tightening of M5 screws.
b. Using the electrical screwdriver, extension and 3 mm bit,
tighten the safety screw and lock washer (supplied) into the
intended hole on the mounting plate at the side.
Ensure that the LOS is still remains between the existing
one and the remote.
7 Install the grounding cable as instructed to the next procedure.
End of procedure.
Continued on next page