User's Manual

Table Of Contents
StreetNodeā„¢ 6250 PTP
Installation & Cabling Manual - Edition 2.1
51
Mechanical Installation & Grounding, Continued
Grounding
cable
installation
procedure
Step
Action
1 Prepare and terminate the grounding cable as instructed in
Appendix C: Terminating Grounding cable on page 76
.
2 Use the electrical screwdriver with extension and 8 mm bit, to
remove the M5 screw and one grover.
Install the cable and then insert the grover and nut, as shown
below.
Use the electrical screwdriver with extension and 8 mm bit, to
tighten the M5 screw.
Do not overtighten. Adjust the electrical screwdriver for
tightening of M5 screws.
End of procedure.