User's Manual

Table Of Contents
Chapter 3. Installation of StreetNode 6250 PTP
56
Installation of Traffic Cable(s), Continued
Ethernet
(S-FTP) cable
installation with
SFP, continued
Step Action
4 Push the SFP HOOD flaps to open and then push upwards till
the HOOD locked properly.
Continued on next page