User's Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
StreetNode™ 6250 PTP
Installation & Cabling Manual - Edition 2.1
61
Installation of Power Injector (Power over Ethernet), Continued
Topics
This paragraph describes the following procedure of Power Injectors:
• Mechanical and Cabling Installation (PonE)
• Cabling Installation (PoE)
Tools and
materials
# PonE PoE
Materials Lamp post:
• Item C from Power injectors on
page 6.
• Item E from Power cables on
page 7.
• Item B or C from Grounding
materials on page 9.
• Items A, B, C and D from S-FTP
cables on page 11.
• Item INST-PONE-PL from Pole
fastening materials on page 14.
Wall:
• Item C from Power injectors on
page 6.
• Item E from Power cables on
page 7.
• Item B or C from Grounding
materials on page 9.
• Items A, B, C and D from S-FTP
cables on page 11.
• Items A or B from Power
injectors on page 6.
• Items A, B, C and D from
S-FTP cables on page 11.
Tools
• Items 3, 4, 5 (5 mm bit) and 6
from Equipment installation tools
on page 38.
• Ethernet cable termination tools
on page 39.
• Grounding cable termination
tools on page 40.
• Ethernet cable termination
tools on page 39.
Continued on next page