User's Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
StreetNode™ 6250 PTP
Installation & Cabling Manual - Edition 2.1
81
Appendix E: Standards of Compliance
This product is in full compliance with the following standards:
Radio/Use of Spectrum:
ETSI EN 302217-3 ν2.2.1 : 2014
ETSI EN 302217-4-2 v1.5.1 : 2010 (antenna)
FCC Part 15.255
EMC / EMI :
ETSI EN 301 489-1 v1.9.2: 2011
EΤSI ΕN 301 489-4 ν2.1.1 : 2012
EΝ 55022:2010
EΝ 61000.3-2:2006 +A1:2009 +A2:2009
EN 61000-3-3:2008
FCC Part 15 Subpart B
Health and Safety:
EΝ 60950-1:2006 +A11:2009 +A1:2010 +A12: 2011
EN 60950-22: 2006
EN 50385 : 2002
EN 60215:1989 +A1:1992 +A2:1994
IEC/UL/CSA 60950-1
IEC/UL/CSA 60950-22
RoHS : EN 50581 :2012
Eco Design: CR (EC) No. 278/2009
Environmental:
ETSI EN 300019-2-4 V2.2.2, Class 4.1 / (Mechanical 4M5) (Operation)
(Within Spec Operating temperatures: -33°C to +55°C, Operational at -50°C).
IEC 60529, Class IP67 (Protection against dust and water)
ETSI EN 300 019-2-2 v2.1.2, Class 2.3 (Transportation)
ETSI EN 300 019-2-1 v2.1.2, Class 1.2 (Storage)