Installation Manual

Table Of Contents
Chapter 3. Installation of StreetNode 6250 PTP
54
Installation of Traffic Cable(s), Continued
Ethernet
(S-FTP) cable
installation with
SFP
To install StreetNode
TM
6250 PTP SFP Ethernet (S-FTP) cable with SFP,
proceed as follows:
Step
Action
1 Prepare and terminate the Ethernet cable as instructed in
Appendix A: Terminating Ethernet (S-FTP) Cable on page 67
.
Slide all three parts of the supplied gland over the S-FTP cable
(StreetNode
TM
6250 PTP side), as shown below:
Continued on next page