Installation Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
Appendix C: Terminating Grounding cable
76
Appendix C: Terminating Grounding cable
Topics
This paragraph describes the following procedures of grounding cable
termination:
• StreetNode
TM
6250 PTP
• PonE
StreetNode
TM
6250 PTP
How to terminate the grounding cable of StreetNode
TM
6250 PTP, proceed
as follows:
Step
Action
1
Cut the grounding cable
(1)
according to the distance between
StreetNode
TM
6250 PTP and grounding bar.
2 Use the blade to strip 1 cm from each end of the cable.
3 Perform the following:
a.
Slide the M5 terminal ring over the wires at one end of the cable
and crimp it with the special crimping tool (for 16 mm
2
).
b.
Cut the heat shrinkable tube in the middle in two equal pieces in
order to use one piece per cable side.
c. Slide the one piece of the heat shrinkable tube over the cable.
Heat it over rear grounding ring body and down on to cable
jacket using the hot air blower.
4
Repeat step 3 for the other end of the cable using the appropriate
terminal ring.
• M5 ring (StreetNode
TM
6250 PTP side).
• Appropriate ring (grounding terminal side).
End of procedure.
Continued on next page
(1)
If the distance is more than 2 m then use the cable GND-CAB16-ID or GND-CAB16-OD.
~
~
1 cm
1
cm